1. The foundation should be smooth enough and without sand. Grinding and leveling it. Be sure it does not exceed±3mmwhen measured by 3m straightedges.
2. According to the daily construction plan, put the prefabricated rubber running tracks on the planned position.
Draw the basic line according to the drawing.
3. Stir the adhesive as required which will be used within one hour
4. Take the stirred glue to the required area, and scratch the glue 2-3 meters equably with toothed scrapers.
5. Put the rubber roll materials on the fixed position, and unfold it to be connected with adhesive.
6. Use a special trowel to forcefully flatten the running track surfaces.
Eliminate the air bubbles remaining in the bonding process of the roll and the base.
7. The gap should be fixed by nails.
8. After fixed by nails, pressed by bricks for better connection.
9. Clear the athletics track
10. After finishing the installation, check the whole field, and any gaps filled with adhesive to be smooth. Then clean the whole field, keep it clean
11. Draw the line according to the drawing.
12. Lengthen the straight track line, and then make the running track number.