Project Completion Picture
Location: Lanzhou,Gansu Province
Area:23000㎡
Materials: 9/13/20/25mm prefabricated/tartan rubber running track
Certification:WORLD ATHLETICS. Class1 ATHLETICS FACILITY CERTIFICATE
The upper layer of the athletic track is a wear-resistant layer, which plays a role in protecting the coiled material, and has the effects of anti-ultraviolet, anti-aging, increasing friction and anti-skid; the lower layer is an elastic layer, designed as The honeycomb structure has high-performance rebound ability and impact absorption ability, which can reduce the joint damage of athletes to a certain extent, and at the same time bring good sports experience to athletes.
Lanzhou Olympic Sports Center has a total land area of about 516,000 square meters and a total construction area of about 430,000 square meters, of which the construction area of the stadium is 80,400 square meters. Among them, the Rose Stadium is a national first-class venue capable of hosting international individual sports events and domestic comprehensive sports events, and will undergo the venue certification and acceptance of the Chinese Athletics Association in the future.
We undertook the design and installation of the tartan athletics of the Rose Stadium.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.